ABB to supply control system for Trans-Anatolian gas pipeline

Gas Pipeline

ABB has won a large contract for the 1,850 km Trans-Anatolian Natural Gas Pipeline (TANAP) to bring Azerbaijan’s natural gas directly to Europe.

ABB will deliver the control system, telecommunications, pipeline monitoring, security systems including fiber-optic cables to transmit data along the pipelines.

The $11 billion pipeline will interconnect with two others: the South Caucasus at Turkey’s border with Georgia and the Trans Adriatic at its border with Greece.

The gas will come from the Shah Deniz 2 field in the Caspian Sea and it will enter the European network in Italy. It will cross the whole of Turkey, with TANAP forming the central section of the $45 billion Southern Gas Corridor, which will be part of Europe’s future strategic energy infrastructure.

The software solutions will integrate the supervisory control and data acquisition (SCADA) systems and the telecommunications that control the gas flows, detect leakages or intrusions and make closed circuit television (CCTV) coverage available for safety and security purposes.

Please register to comment on this article